The installation of the hydraulic coupling of the bucket hoist is mainly focused on the following four points:
1, The reducer and base using bolts to strengthen, the bolt nut and splint, the amount of the block are fixed on the shaft of the motor.
Here, the surface of the measuring surface and shaft is in need of contact.
2. Next, turn the motor shaft and use a combination of measuring blocks and plug to measure the gap between the reducer shafts.
Measurements are made from eight different locations, with the same measurement results, indicating that the coaxial degree has been adjusted.
3, In the measurement, the first measuring block to the top position, two points of measurement, go to the left, to the left two points of measurement.
When the first two points of data are at odds, adjust the base of the motor to rotate clockwise or counterclockwise or to pan.
4, The same is true of other measuring points, until the coaxial, and finally tighten the foot bolt on the number, again to carry out the coaxial degree check. If it is correct, the top of the four bolts on the base of the motor is exposed to the motor seat, and there is no need to use too large a sharp tool at this time. Then remove the motor, install the coupler, install the rear coupler and then load the motor back to its original position. It is important to note that at this point, close attention must be paid to the front side of the click and the top of the four bolts must be exposed to the fastening motor of the foot bolts. Moreover, the motor cannot be moved when the bolts are tightened.
